Site Manager

  • Think Recruitment
  • 02/07/2026
Seasonal Construction

Job Description

Gloucester Royal Hospital - Civils / Enabling & Minor Works Package

Duration: 5 months

Start: ASAP

We are currently delivering a predominantly civils-led package at Gloucester Royal Hospital, supported by specialist subcontractors covering steelwork, masonry, joinery, doors and associated building elements.

Scope of works includes:

  • Preparation of multiple areas for CFA piling (circa 60 remaining)
    • Installation of ring beams following piling completion
    • Concrete slab construction across multiple areas (circa 120m )
  • Masonry structure works (circa 100m ), including timber trusses and slate roof coverings
    • Minor internal wall construction
  • Epoxy floor coatings (circa 60m )
  • Kerbing (circa 100 linear metres)
  • EPDM roofing (circa 14m )
  • Small canopy extension
  • Replacement of soffits and fascias (circa 33m )
  • Structural steel elements including wind posts, trimmer beams, and temporary/permanent steel for large generator installations
  • Tarmac surfacing (circa 180m )
  • Drainage works including French drains, diversions, and new installations to service new structures
  • Installation of metal doors and louvres (circa 15nr)

This package combines enabling works, civils and associated minor building elements within an active hospital environment.